Traffic Switch Planned for Yorktown Boulevard at Rodd Field Road

CORPUS CHRISTI, TX— Ongoing work will require a traffic switch along Yorktown Boulevard from Rodd Field Road to Oso Creek Mud Bridge.

Beginning Wednesday, April 22, crews will close intersections at Pari Drive, Fold Lane, Azali Drive and Karo Drive to remove existing temporary ramps. There will be a detour on Talbot Drive.

On Saturday, April 25, crews will remove temporary ramps at Latitude Street, Oso Creek Church, Talbot Drive and Locked and Boxed.

Yorktown Boulevard traffic will close on the eastbound lanes from Rodd Field Road to Oso Creek Mud Bridge. Traffic will shift to allow two-way travel on the remaining lanes.

Access to neighborhoods and businesses will remain available during construction. There will be a detour on Rodd Field Road.

Crews will first work on the intersections at Oso Parkway and Leadership Drive. Next, Rancho Vista Boulevard, Fred’s Folly Drive and Ranch View Drive.

The detour via Ranch View Drive will remain in place until Loyd Neal Drive, Lasso Drive and Krypton Drive reopen.

The work is part of the Yorktown Boulevard road reconstruction project, a voter-approved Bond 2020 project expected to be completed in the fall of 2027.

A detailed map showing the road closures is below.

Safety remains a top priority, and motorists traveling through this area must follow the posted detour signs to navigate the construction zone. Detours will be clearly marked to ensure minimal disruption and maintain traffic flow.

The City of Corpus Christi is committed to projects that maintain or improve streets and infrastructure for every city resident, business, and visitor.

For more information, media representatives can contact Bryan Quitania, Senior Public Information Officer, at 361-826-3884 or by email at BryanQ@CorpusChristiTX.gov.

Map showing closure on Yorktown.