Up River Road at Poth Lane Closure for Water Line Installation
CORPUS CHRISTI, TX – Beginning on Tuesday, September 8, and continuing until Tuesday, November 3, a northbound section of Up River Road will be closed at Poth Lane for water line installation to improve local infrastructure and enhance water service reliability. Access for residents and businesses will remain available during construction.
A detailed map is included to illustrate the full extent of the lane closure.
Safety remains a top priority. Motorists are urged to follow posted detour signs to navigate the construction zone safely. Detours will be clearly marked to ensure minimal disruption and maintain traffic flow.
The City of Corpus Christi is committed to projects that maintain or improve streets and infrastructure for every city resident, business, and visitor.
For more information, media representatives may contact Beth Becerra, Public Information Officer, at elizabethb3@CorpusChristiTX.gov or (361) 826-1693.
