Street Closures and Traffic Impacts - September 25, 2026
CORPUS CHRISTI, TX—Below are street closures along major City streets that impact motorists and pedestrians. These closures may be due to construction, special event activity, or maintenance. All closures are subject to change due to weather, emergency work, or other circumstances.
Work zone safety is a priority. Motorists are advised to slow down, follow posted speed limits, pay attention, watch out for workers, obey signs and flaggers, and allow additional travel time for delays.
CITY STREET RECONSTRUCTION OR MAINTENANCE PROJECTS
Carroll Lane - SPID to Holly Road
One-way traffic from Holly Road to SPID on Carroll Lane. Neighborhoods and businesses will remain accessible during construction.
Flour Bluff Drive -- Don Patricio Road to Compton Road
A section of Flour Bluff Drive from Don Patricio Road to Compton Road will be restricted to one lane of travel for approximately three weeks.
Holly Road -- Rodd Field Road
A section of Holly Road between Toben Drive and Rodd Field Road will be closed through Friday, October 16.
Horne Road at Rambler Street
Wastewater line repair work will require the closure of a section of Horne Road at Rambler Street. One eastbound lane will remain open to traffic.
Howard Street - Ben Garza Gym
Barricades have been installed at the end of Howard Street, near Ben Garza Gym at 1815 Howard Street, which will be temporarily closed to the public.
O’Day Parkway -- Weber Road to Shadow Wood Drive
Ongoing construction for the reclaimed water project will close a section of O’Day Parkway between Weber Road and Shadow Wood Drive. This closure will be in effect through Monday, October 26. One-way westbound traffic will be allowed in this section.
Starlite Lane — Sunny Drive to Kingwood Drive
Starlite Lane will be closed from Sunny Drive through Kingwood Drive. Neighborhoods and businesses will remain accessible during construction. This section will remain closed through January.
Surfside Boulevard -- at Gulfspray Avenue
The intersection of Surfside Boulevard at Gulfspray Avenue will be fully closed to traffic.
Up River Road -- at Poth Lane
The northbound section of Up River Road will be closed at Poth Lane for water line installation to improve local infrastructure and enhance water service reliability.
Washington Coles Park -- Road Closures
The following intersections will be closed during the construction period: Winnebago Street and N. Alameda Street, Winnebago Street and Sam Rankin Street, Sam Rankin Street and Lake Street, and Sam Rankin Street and Lobo Street.
Yorktown Boulevard – Rodd Field Road to Oso Creek Mud Bridge
Construction is underway on the Yorktown Boulevard project. The eastbound lanes of Yorktown Boulevard will be closed from Rodd Field Road to the Oso Creek Mud Bridge. Traffic will be redirected to the westbound lanes, allowing two-way traffic to flow.
CITY PERMITTED CLOSURES
Lomax Street – North Mesquite Street to North Chaparral Street
A contractor will have two 20-cubic-yard dumpsters on site for approximately 30 days. TAMUCC is renovating its first floor at Lomax Street & Chaparral Street. The project requires equipment to remove trash and debris.
John Sartain Street – North Chaparral Street to North Water Street
N. Water Street – Lomax Street to John Sartain Street
N. Chaparral Street – Lomax Street to John Sartain Street
A contractor will renovate the exterior fascia of the Education Service Center building in the 300 block of John Sartain Street, downtown Corpus Christi. The contractor will temporarily occupy the parking spaces along N. Water Street, John Sartain Street, and N. Chaparral Street, adjacent to the building. Warning signs will advise motorists and pedestrians in advance regarding the construction. Construction at this location is expected to last several weeks.
Clearbrook Dr and surrounding area – ADB – fiber installation
An AT&T contractor will be conducting boring and fiber activities within the City ROW on Clearbrook Drive and in the surrounding area. Affected streets are as follows: Spring Brook Drive, Boston Drive, Benchfield Drive, Cold Springs Drive, Timber Crest Drive, Cedar Brook Drive, Stony Brook Drive, and Northfield Drive.
Rancho Vista Blvd and surrounding area – ADB – fiber installation
An AT&T contractor will perform boring and fiber activities within the City ROW on Clearbrook Drive and the surrounding area. Affected streets are as follows: Cattleman Drive, Brown Drive, High Gun Drive, Lands End Drive, Nuss Drive, Nuss Alley, Vanessa Aly, Vanessa Drive, Bryson Way, Stampede Drive, Elizondo Drive, Idel Hour Drive, Dr. Hector P. Garcia Drive, Vishal Drive, Todd Hunter Drive, Ames Street, Bayley Lane, and 7722 Griffen Drive.
1313 Port Ave and surrounding area – ADB – fiber installation
An AT&T contractor will perform boring and fiber activities within City ROW on Morgan Avenue, S Port Avenue, Baldwin Boulevard, Rosewood Street, Espinosa Street, Sabinas Street, Verbena Street, Elgin Street, Bright Street, Reyna Street, Agrito Street, Osage Street, and Aztec Street.
7722 Griffen Dr, Corpus Christi, TX and surrounding area – ADB – fiber installation
An AT&T contractor will perform boring and fiber activities within City ROW 7722 Griffen Drive, Yorktown, Rodd Field Road, and Geiger Drive.
Allencrest and surrounding area – ADB – fiber installation
A contractor for AT&T will be executing boring and fiber activities within City ROW on Allencrest Drive, Ostinato Drive, Coda Drive, Crescendo Drive, Andante Drive, Forte Drive, Presto Drive, Allegro Dr, and Camwood Drive.
Nemo Court & Park Road 22 – Waterline installation
A contractor will be executing temporary road closures and excavation to install a waterline within the City ROW on Nemo Court.
1502 Horne Road /Fire Station #10 - SANITARY SEWER tie-in at existing manhole.
A contractor has closed the right lane of the 1500 block of westbound Horne Road due to ongoing construction.
Kostoryz Road to Sunnybrook Road- 23178 Fire Station #8
A contractor has closed the right lane of northbound Kostoryz Road from the 4600 block of Kostoryz Road to Sunnybrook Road due to ongoing construction.
Winnebago Street / Coke Street
A contractor will be excavating on Coke Street for utility tie-ins related to improvements to the North Aquatic Center.
Waldron Road/ Caribbean Drive
An AT&T contractor will perform boring and fiber activities within City ROW along Waldron Road from Claride Street to Caribbean Drive. Palmero Street is closed at Palmero Street between S. Alameda Road and Lawnview Street.
Lomax Street/John Sartain Street Sidewalk
A contractor will be working on the exterior fascia of the Education Service Center building in the 300 block of John Sartain Street, downtown Corpus Christi. The contractor will temporarily occupy the sidewalk along Chaparral Street, from Lomax Street to John Sartain Street, adjacent to the building. Warning signs will advise pedestrians in advance regarding the construction.
Airline Road and Williams Drive
Signal improvements and repairs are underway at Airline Road and Williams Drive.
813 Artesian Street
A contractor will perform boring and fiber activities within the City ROW, resulting in temporary road closures affecting Artesian Street, Lipan Street, Carranchua Street, Leopard Street, Antelope Street, Winnebago Street, Waco Street, and Beldon Street.
502 S. Chaparral Street
Sidewalk and Public Improvements
McArdle Road and Andover Drive
A contractor will perform boring and fiber activities within the City ROW, resulting in temporary Sidewalk closures affecting McArdle Road and Andover Drive.
3226 S. Alameda Street
Contractor will perform boring and fiber activities within City ROW along Alameda Street, Santa Fe Street, and Primrose Drive.
Oso Parkway
A contractor will perform boring activities within the City ROW, executing temporary road closures along Oso Parkway.
Coopers Alley
Contractor will perform boring activities within City ROW along Coopers Alley
Staples at McArdle
Contractor working on IDIQ DO10 project (water line) within City ROW, executing temporary road closures affecting Staples Street and McArdle Road.
802 S. Carancahua Street
Contractor performing work for Bay Vista Apartments within City Row executing temporary road closures affecting Carancahua Street, Hancock Avenue, Water Street, and Furman Street,
N. Staples Street
Contractors will perform boring activities within the City ROW, resulting in temporary road closures along North Staples Street, Blucher Street, and Caldwell Street.
Smith Drive
Contractor performing exploration activities within the City’s ROW, executing temporary road closures along Smith Drive, Vista Ridge Drive, and Calallen Drive.
CITY SPECIAL EVENTS
Friday, September 25 through Sunday, September 27:
- Texas Food Championship – The Waters Edge
All Day
Friday, September 25
- Hillard Center Block Party
7:00 pm until 11:59 pm
Saturday, September 26:
- Walk for Memory – Cole Park Plaza
9:00 am until 11:00 am - Veterans Committee Event: Gold Star Event – Sherrill Park
9:00 am until 10:00 am
ADDITIONAL RESOURCES
Corpus Christi Street Information – www.cctexas.com/streetinfo
DriveTexasTM – drivetexas.org
Harbor Bridge Project – www.harborbridgeproject.com/traffic-updates/road-lane-closures/
Safe Fun Fit - Safe Fun-Fit at the Bayfront
About Us
The Mission of the Public Works Department is to manage, maintain, and develop the City's street and storm water systems. This is accomplished by maintaining street pavement; operating and maintaining traffic signals, signs and markings, planning and developing the street system; and providing storm water management services.
Contact Information
Address:
2525 Hygeia Street
Corpus Christi, Texas 78415
To Report a Problem:
» Call 3-1-1
Street Operations:
» (361) 826-1961
Storm Water:
» (361) 826-1610
Traffic Operations:
» (361) 826-3547